{{getDisplayDistance(item.locationRange) }}
  • {{ option.name }}
photo

DCAM MOERDIJK

Middenweg 0
4782PM Moerdijk
€ 55,- per m² / Jaar

€ 55,- per m² /
2.484 m²
964 m²
5000.0 per m²
12.0 meter
,

DCAM MOERDIJK

DCAM Moerdijk 
A new logistics facility located at the Middenweg in the Port
of Moerdijk, West Brabant, Netherlands.
• Recently voted as the top logistics hotspot in the
Netherlands
• Good availability of suitable labour
• Good cooperation with local and regional authorities
who focus on transport & logistics occupiers
• Direct access from the A16 & A17 motorways
• Excellent multi-modal connections to the Benelux and
Germany, via road, rail, sea and inland waterways

Warehouse Overview
• Clear height 12.20m
• Column span of 23m optimised for both narrow
and wide aisle racking configurations
• 1 dock per 850m² warehouse
• Automated, electric doors on ground floor level
(4m x 4.2m)
• Average floor load capacity of 5000 kg/m²
with maximum point load of 80 kN
• Flatness floor according DIN 18202 Tabel 3 Zeile 4
• ESFR sprinkler system, installed to meet FM Global
standards.
• Fire hose reels, fire alarm and evacuation system
• LED lights equipped with dynamic dim function,
delivering 200 Lux at 1.5m
• Charging station for lifting trucks – 1 station
per 1,000m² of warehouse

Office Overview
• Heat pump VRF-cooling system
• Energy efficient heat recovery system
• Fire hose reels, fire alarm and evacuation system
• Sprinkler system
• LED lights with average light intensity 400 Lux office rooms
• Ceramic tiles to entrance area, reception area and sanitary
rooms
• Toilet facilities
• High end finishing of walls and modular ceiling

Mezzanine Overview
• Floor load of 5 kN/m²
• Translucent panels for natural light
• Steel stairs and balustrade

External Features
• Full separation of truck and car transport flows
• Loading area with depth of 35 meters
• External areas constructed with heavy duty paving
• Reinforced concrete surfaces in front of the loading doors
• 2m high perimeter fencing
• Electrically operated entrance gates
• Bicycle shed
• Outdoor LED lightning

Thermal Performance
• The building temperature can be maintained at 10°
Celsius without the need for heating thanks to the
overall insulation level of the building
Power Management
• Motion detection sensors allow for intelligent lighting
and will reduce energy consumption for lighting to
under 3 Watt/m². Cost savings compared to traditional
lighting are approximately 3 €/m² per year

Development Areas
• 4ha land
• 26,358m² of warehouse units
• 964m² of office space
• 2,484m² mezzanine
• 29,806m² in total
Building Elements
• 30 docks
• 2 ground level doors
• 37m docking yard depth
• 2 + 2 staircases to mezzanine
(2 in office and 2 in warehouse)
• 150 car parking places
• 200m² of covered bicycle parking

Rent Levels
• Warehouse units: 55 €/m²
• Offices: 126 €/m²
• Mezzanine: 26 €/m²
Time Schedule
• Early access: August 2018
• Handover: September 2018

DCAM Moerdijk 
A new logistics facility located at the Middenweg in the Port
of Moerdijk, West Brabant, Netherlands.
• Recently voted as the top logistics hotspot in the
Netherlands
• Good availability of suitable labour
• Good cooperation with local and regional authorities
who focus on transport & logistics occupiers
• Direct access from the A16 & A17 motorways
• Excellent multi-modal connections to the Benelux and
Germany, via road, rail, sea and inland waterways

Warehouse Overview
• Clear height 12.20m
• Column span of 23m optimised for both narrow
and wide aisle racking configurations
• 1 dock per 850m² warehouse
• Automated, electric doors on ground floor level
(4m x 4.2m)
• Average floor load capacity of 5000 kg/m²
with maximum point load of 80 kN
• Flatness floor according DIN 18202 Tabel 3 Zeile 4
• ESFR sprinkler system, installed to meet FM Global
standards.
• Fire hose reels, fire alarm and evacuation system
• LED lights equipped with dynamic dim function,
delivering 200 Lux at 1.5m
• Charging station for lifting trucks – 1 station
per 1,000m² of warehouse

Office Overview
• Heat pump VRF-cooling system
• Energy efficient heat recovery system
• Fire hose reels, fire alarm and evacuation system
• Sprinkler system
• LED lights with average light intensity 400 Lux office rooms
• Ceramic tiles to entrance area, reception area and sanitary
rooms
• Toilet facilities
• High end finishing of walls and modular ceiling

Mezzanine Overview
• Floor load of 5 kN/m²
• Translucent panels for natural light
• Steel stairs and balustrade

External Features
• Full separation of truck and car transport flows
• Loading area with depth of 35 meters
• External areas constructed with heavy duty paving
• Reinforced concrete surfaces in front of the loading doors
• 2m high perimeter fencing
• Electrically operated entrance gates
• Bicycle shed
• Outdoor LED lightning

Thermal Performance
• The building temperature can be maintained at 10°
Celsius without the need for heating thanks to the
overall insulation level of the building
Power Management
• Motion detection sensors allow for intelligent lighting
and will reduce energy consumption for lighting to
under 3 Watt/m². Cost savings compared to traditional
lighting are approximately 3 €/m² per year

Development Areas
• 4ha land
• 26,358m² of warehouse units
• 964m² of office space
• 2,484m² mezzanine
• 29,806m² in total
Building Elements
• 30 docks
• 2 ground level doors
• 37m docking yard depth
• 2 + 2 staircases to mezzanine
(2 in office and 2 in warehouse)
• 150 car parking places
• 200m² of covered bicycle parking

Rent Levels
• Warehouse units: 55 €/m²
• Offices: 126 €/m²
• Mezzanine: 26 €/m²
Time Schedule
• Early access: August 2018
• Handover: September 2018

MapViewLoading animation here
StreetViewLoading animation here

Contact

{{item.Location.Street}} {{item.Location.HouseNumber}} {{item.Building.BuildingName}}

{{item.Location.Street + " "+ item.Location.HouseNumber}}
{{item.Location.Postcode}} {{item.Location.City}}

{{ 'SEARCH.SEARCH_BAR_LEFT.TYPE_LIST.' + item.Offer.OfferType|translate }}

{{ item.Offer.OfferMetrageNet|formatNumber }} m²

{{ 'SEARCH.SEARCH_RESULT.GRID.RentFrom'|translate }} {{ item.Offer.OfferMetrageLetMinimalFrom|formatNumber }} m²

  • {{ 'SEARCH.SEARCH_RESULT.LIST.BuildingStatus'|translate }}:{{ 'SEARCH.SEARCH_RESULT.SHARED.BuildingStatusList.'+item.Building.BuildingStatus | translate }}
  • {{ 'SEARCH.SEARCH_RESULT.LIST.FloorArea'|translate }}: {{ item.Offer.OfferMetrageNet | formatNumber }} m²
  • {{ 'SEARCH.SEARCH_RESULT.LIST.RentFrom'|translate }}:{{ item.Offer.OfferMetrageLetMinimalFrom|formatNumber }} m²
  • {{ 'SEARCH.SEARCH_RESULT.LIST.ParkingSpaces'|translate }}:{{item.Offer.OfferNumberOfParkingSpaces|formatNumber}}